Sanitation Masterplan for the Service Area of Jerusalem Water Undertaking

 The “Sanitation Master Plan for the Service Area of Jerusalem Water Undertaking in Ramallah/Al Bireh District”, works towards the improvement of the living conditions of the people in the Palestinian Territories by improving the collection, treatment and disposal of wastewater and providing reliable sustainable services to the population; Providing a sound basis for the future development of a comprehensive wastewater system for the population in the future supply area of the JWU. 

Disciplines

  • Municipal Infrastructure
  • Water Resources Management

Companies

Dorsch Impact GmbH

Client

Jerusalem Water Undertaking (JWU), financed by KfW

Duration

From 2017 to 2018

Location

Ramallah / Al Bireh District, Palestine

Project Activities

  1. Developing a SMP for the service area of Jerusalem Water Undertaking (JWU) being located in the Governorates of Ramallah and Al Bireh including the Jerusalem Governorate (parts J-1 and J-2). 

  2. The SMP shall comprise the following aspects: 

  • Treatment and final disposal of domestic, commercial, institutional wastewater, etc.; preliminary design for sewer networks and main collectors and estimation of design parameters for WWTP; the level of sanitation services shall cover – central vs. cluster / on-site solutions. 

  • Finalisation of the cadastre for industrial wastewater and related basic estimations (quantity, quality, range of treatment). 

  • Analysis of quantities of faecal sludge for treatment in WWTP 

  • The collection of storm water and addressing of hot spots through preliminary designs. 

  • Comparison of wastewater treatment options and selection of preferred option for energy efficiency and recovery. 

Contributing to the UN Sustainable Development Goals

We are committed to making a positive impact and supporting the UN Sustainable Development Goals (SDGs). This project contributes to the following SDGs:

Clean water and sanitation
Affordable and clean energy